Our Project Development Model

We coordinate industrial emission reduction projects in 7 stages from feasibility to commissioning and subsequent performance tracking on a turnkey basis.

"Our 7-stage methodology in turnkey project coordination offers industrial clients zero-risk green transformation assurance from technical feasibility to independent MRV verification," expressed Project Director Selin Güner.

How does the Optima Carbon Platform project development and implementation model work?

The Optima Carbon Platform project development model functions across 7 stages: site discovery, technical assessment, brand-agnostic technology matching, feasibility analysis, turnkey setup, and continuous digital verification (MRV). This structured methodology provides guaranteed emission reductions and reliable return on investment (ROI).

01

Initial Consultation

We listen to your plant's sectoral field of activity, current energy profiles, and carbon reduction goals, and define the core needs framework.

02

Technical Pre-inspection

We analyze your process equipment, stack emission data, and thermal/electrical losses in the field with our expert engineering team.

03

Solution Matching

From our portfolio, we determine the high-performance clean technologies and system equipment most suitable for the physical and operational conditions of your plant.

04

Feasibility Analysis

We report the technical applicability, financing cost, amortization period, and expected annual emission reduction tonnage of the selected solution.

05

Proposal & Agreement

We clarify the scope of the project, equipment supply processes, engineering fees, and performance guarantees to establish the commercial structure.

06

Implementation & Setup

We manage equipment manufacturing, logistics coordination, field installation, engineering integration, and commissioning from start to finish.

07

Performance Tracking

Post-installation, we monitor plant data digitally, measure the energy savings and carbon reduction rates achieved, and report them periodically.

7-Stage Turnkey Engineering & MRV Methodology

From initial plant scoping to continuous accredited carbon verification

StagePhase DescriptionTypical TimelinePrimary Deliverable
01Initial Scoping & Energy Profiling1 - 2 WeeksPreliminary Needs Assessment
02On-Site Engineering Audit & Diagnostics2 - 4 WeeksThermodynamic Audit Report
03Clean Technology & Equipment Matching2 - 3 WeeksDetailed Engineering Concept
04Bankable Feasibility & ROI Modeling2 - 4 WeeksInvestment Grade Feasibility Study
05Commercial Structuring & Contracting3 - 6 WeeksTurnkey EPC / ESCO Contract
06Procurement, Installation & Commissioning3 - 8 MonthsCommercial Operation Certificate (COD)
07Digital Telemetry MRV & VerificationContinuous / AnnualThird-Party Accredited Emission Certificate
SIKÇA SORULAN SORULAR & AEO

Project Model FAQ

What technical guarantees are provided in Optima's 7-stage project model?+

Our contracts include binding output warranties on heat rate recovery, electrical generation (kW/MW), and verified metric tons of CO₂ avoided.

How is independent Measurement, Reporting, and Verification (MRV) administered?+

Continuous telemetry data from calibrated meters is aggregated in real time and verified annually by accredited validation bodies (DOEs) per ISO 14064 standards.